Please Enter Your Keyword
Client
  • R&W Buildings, Inc.
Construction Cost
  • $1,300,000

This Design/Build project at Scott Air Force Base encompassed various renovations, including the construction of a new 2-story building and a new 1-story building within the existing hangar building footprint.  New construction included administrative offices and secure equipment storage for the 932nd Airlift Wing / Aircraft Maintenance Squadron.  The renovation work included replacement of deteriorated hangar door seals and brushes, along with upgrades to the wash rack equipment and electrical panel boards.

Get in touch with us Contact Us
Connect with us on LinkedIn or Instagram